3 stations production process:
1)The first station
Plastic particles into the injection mold cavity after injection system, form the preform,the size of the bottle neck can be accurate and stable.
2)The second station
Rotate 90 degrees,preform to the stretch&blow station,to stretch blow molding preform for container.
3)The third station
rotate again, the completed containers will be ejected in this station, one product production cycle is finished.